Water Treatment Plant Design

Water treatment plant design: process, hydraulic and structural

Conventional water treatment plants designed from the raw water inlet to the clear water reservoir, for EPC contractors bidding and executing municipal and multi-village schemes.

We design water treatment plants as a complete civil package. The process sizing, the hydraulic profile through the unit train and the structural design of every RCC unit are done in one office, so the levels, openings and loads agree across the three disciplines before the drawings are issued.

Our largest plant to date is the 274 MLD WTP for the Mukane water supply augmentation of Nashik Municipal Corporation. Multi-village plants of 14 to 23 MLD for Madhya Pradesh Jal Nigam, and town plants of 3 to 7 MLD under AMRUT 2.0, make up the rest of our WTP work.

Plant units we design

  • Inlet chamber, cascade aerator and Parshall flume
  • Flash mixer and flocculator / clariflocculator
  • Rapid gravity sand filters and filter house
  • Chlorine contact tank and chlorine building
  • Clear water reservoir and pure water sump
  • Backwash water recovery and sludge handling units
  • Raw and clear water pump houses
  • Chemical house, MCC room and administrative block

How the design is done

What goes into the design

Process design

Unit sizing to CPHEEO criteria for the design flow, detention times, surface loading and filtration rates, and the chemical dosing basis.

Hydraulic design

Hydraulic profile across the full unit train, weirs, channels, launders and interconnecting pipework, checked at peak flow.

Structural design

Liquid-retaining RCC design to IS 3370 (2021) with crack-width checks, flotation, sliding and overturning, plus framed buildings to IS 456 and IS 1893.

Deliverables

What you receive

  • Process and hydraulic design calculations
  • Hydraulic profile drawing
  • Civil GAD of every unit
  • Structural design workbooks with code clause references
  • RC detailing drawings and bar bending schedules
  • Concrete and reinforcement quantity abstract

Codes and standards

  • IS 456Plain and reinforced concrete
  • IS 3370 (2021)Liquid retaining structures
  • IS 800General construction in steel
  • IS 1893 / IS 13920Seismic design and ductile detailing
  • SP 34 / IS 2502Detailing and bar bending
  • IS 875Loads on buildings and structures
  • CPHEEOWater Supply & Sewerage Manuals
  • IS 1904 / IS 2911Foundations and piles

Relevant experience

Projects from our reference list

Project / workClient / contractorOur scope

Augmentation of Mukane Water Supply Scheme — 274 MLD WTP and Vilholi–Gandhinagar gravity main, for Sinhastha Kumbh

Nashik Municipal Corporation (Water Supply Dept.)

Structural design of WTP units

Moojhri Dam Multi-Village Scheme, Dist. Sheopur — turn-key with 10 years O&M

Madhya Pradesh Jal Nigam Maryaditvia Jalaram Projects Pvt. Ltd. & Zetwerk Manufacturing Businesses Pvt. Ltd. (JV)

14.30 MLD WTP

Augmentation of Water Supply, Keolari Town — 3 MLD WTP (AMRUT 2.0)

Nagar Parishad Keolari, Dist. Seoni

Process, structural design and GAD of the WTP, 9 ESRs and 2 sump-cum-pump houses

7 MLD WTP, Bhamragad (AMRUT 2.0)

Nagar Panchayat Bhamragad, Dist. Gadchiroli (M.H.)

Chlorine building, combined chlorine contact tank, pure water sump and pump house

Sanaudha-2 (Banda Dam) Multi-Village Scheme, Dist. Sagar

Madhya Pradesh Jal Nigam Maryadit

WTP — 15 MLD

Questions

Frequently asked

Do you design the process, or only the structure?

Both. We can take a WTP from process sizing and the hydraulic profile through to the structural design, RC drawings and BBS, or take only the structural scope against a process layout supplied by the technology provider.

What capacity range have you designed?

From 3 MLD town plants to the 274 MLD WTP for Nashik Municipal Corporation.

Can you support us at bid stage?

Yes. Pre-bid sizing, the plant footprint and budgetary quantities are typically issued in 3 to 5 working days.

Let’s discuss your project

Send us the drawings, the tender scope or simply the brief, and we will revert with a scope note, a delivery schedule and a fee proposal.