ESR, GSR & Sump Design
ESR, GSR, sump and clear water reservoir design
Elevated and ground-level water-retaining structures for water supply schemes, designed for crack width, seismic load and staging stability, with drawings ready for departmental submission.
Storage reservoirs are the most repeated structure on a water supply scheme, and the one where a design error is repeated most often. We design each reservoir type from first principles once, then carry it through the scheme with the capacity, staging height, soil and seismic zone of each location.
Our reservoir work includes 31 ESRs on the Tarped multi-village scheme under JJM, 15 ESRs on the Sanaudha-2 scheme, sumps from 30 KL to 3,130 KL at 15 pumping stations on the MAHI multi-village scheme, and overhead tanks of 200 KL to 1,600 KL on 12 to 18 m staging for town schemes across Madhya Pradesh.
Structures we design
- Elevated service reservoirs (ESR / OHT) up to 3,000 KL
- Intze, circular and rectangular container shapes
- Precast ESRs
- Ground service reservoirs (GSR / GLSR)
- Sumps and sump-cum-pump houses
- Clear water reservoirs up to 6,000 KL
- Break pressure tanks and balancing reservoirs
- Staging, bracing and raft or pile foundations
How the design is done
What goes into the design
Liquid-retaining design
Container walls, floors and domes designed to IS 3370 (2021) with crack-width limits checked as a standing part of the design.
Seismic and wind
Staging analysed for tank-full and tank-empty conditions under IS 1893 and IS 875, with ductile detailing to IS 13920 where required.
Foundations
Raft, annular or pile foundations to IS 1904 and IS 2911, checked against the soil report for bearing, settlement and uplift.
Deliverables
What you receive
- Structural design report in departmental format
- Civil GAD with levels, staging and pipe openings
- RC detailing drawings and bar bending schedules
- Quantity abstract for concrete and reinforcement
- Proof-check response until clearance
Codes and standards
- IS 456Plain and reinforced concrete
- IS 3370 (2021)Liquid retaining structures
- IS 800General construction in steel
- IS 1893 / IS 13920Seismic design and ductile detailing
- SP 34 / IS 2502Detailing and bar bending
- IS 875Loads on buildings and structures
- CPHEEOWater Supply & Sewerage Manuals
- IS 1904 / IS 2911Foundations and piles
Relevant experience
Projects from our reference list
Tarped Multi-Village Scheme under JJM, Dist. Chhatarpur
Madhya Pradesh Jal Nigam Maryaditvia LCC Ahmedabad
31 nos. ESRs
Sanaudha-2 (Banda Dam) Multi-Village Scheme, Dist. Sagar
Madhya Pradesh Jal Nigam Maryadit
15 nos. ESRs and CWR at the intake pumping station
MAHI Multi-Village Drinking Water Supply Scheme (Talawada Barrage), Dist. Ratlam & Dhar
Madhya Pradesh Jal Nigam Maryadit, PIU Jhabuavia Megha Engineering & Infrastructures Ltd., Hyderabad
15 intermediate pumping station locations; sumps from 30 KL to 3,130 KL, with pump house GADs and mechanical design calculations
Waidhan-II Multi-Village Rural Water Supply Scheme, Dist. Singrauli
Madhya Pradesh Jal Nigam Maryaditvia Vijay Kumar Mishra Construction Pvt. Ltd.
RCC overhead tanks
Water Supply Scheme, Datia Town
Municipal Council Datia (M.P.)
OHTs 1000 KL / 15 m, 1100 KL / 12 m and 1600 KL / 12 m; 300 KL sump well
Augmentation of Water Supply, Chachaura-Binaganj (AMRUT 2.0)
Nagar Parishad Chachaura-Binaganj, Dist. Guna
200 KL GSR and 200 KL OHT on 15 m staging
Water Supply Schemes — Bhanpura, Hatod and Tendukheda
Nagar Parishads, Mandsaur / Indore / Narsinghpur
OHTs 500 KL / 18 m, 400 KL / 18 m and 700 KL / 18 m
Water Supply Scheme, Bhitawar, Dist. Gwalior (AMRUT)
Nagar Parishad Bhitawar
30 KL sump-cum-pump house and 200 KL GSR
Questions
Frequently asked
Which code do you follow for water-retaining design?
IS 3370 (2021) for liquid-retaining structures, with IS 456, IS 1893, IS 875 and IS 13920 for the staging and foundations, and the CPHEEO manual for the functional requirements.
Do you design precast ESRs?
Yes. Precast ESRs are part of our reservoir experience, alongside conventional cast-in-situ tanks.
Can one design be repeated across many locations on a scheme?
Yes. Reservoir designs are parametric in our in-house suite, so a scheme with many tanks is designed consistently and each location is checked for its own capacity, staging, soil and seismic data.
Let’s discuss your project
Send us the drawings, the tender scope or simply the brief, and we will revert with a scope note, a delivery schedule and a fee proposal.