Sewerage, STP & ETP Design

Sewerage network, STP and ETP design

Sewer and storm water networks for towns and hill settlements, sewage treatment plants from 1.0 to 5.5 MLD, and structural design of industrial effluent and ZLD tankage.

Our benchmark project is the sewerage network for Jyotirmath (Joshimath) in Uttarakhand, for UUSDA. It is one of the most extreme hill regions in which a sewerage scheme can be laid. Steep gradients, restricted alignments and unstable slopes govern every design decision there.

On the treatment side we have designed sewage treatment plants from 1.0 to 5.5 MLD on SBR, MBBR, RMBR and constructed wetland routes, including three STPs for interception and diversion works under SBM 2.0. We have also done the structural design of ETP and zero-liquid-discharge tankage for industrial clients.

Scope

  • Sewerage networks in plain and hill terrain
  • Storm water drains, catch basins and outfalls
  • Sewage pumping stations and wet wells
  • Interception and diversion of nallahs
  • STP process design: SBR, MBBR, RMBR, wetland
  • STP hydraulic profile and unit structural design
  • ETP and ZLD tankage structural design
  • Bio gas (CBG) plant structures

How the design is done

What goes into the design

Network hydraulics

Sewer and storm network design to the CPHEEO manual, with self-cleansing velocity, depth and drop arrangements suited to the terrain.

Process and hydraulics

STP unit sizing for the chosen technology and the hydraulic profile from inlet to outfall.

Structural design

Liquid-retaining design of every tank to IS 3370 (2021), with crack width, flotation and uplift checked as standard.

Deliverables

What you receive

  • Network design calculations and L-sections
  • Process and hydraulic design of the STP
  • Civil GAD, RC drawings and BBS of each unit
  • Quantity abstract

Codes and standards

  • IS 456Plain and reinforced concrete
  • IS 3370 (2021)Liquid retaining structures
  • IS 800General construction in steel
  • IS 1893 / IS 13920Seismic design and ductile detailing
  • SP 34 / IS 2502Detailing and bar bending
  • IS 875Loads on buildings and structures
  • CPHEEOWater Supply & Sewerage Manuals
  • IS 1904 / IS 2911Foundations and piles

Relevant experience

Projects from our reference list

Project / workClient / contractorOur scope

Jyotirmath (Joshimath) Sewerage

UUSDA, Uttarakhand

Sewerage network design in extreme hill terrain — benchmark project

Interception & Diversion of Nallahs with STP Works, Bijuri (SBM 2.0)

Nagar Palika Parishad Bijuri, Dist. Anuppur

STPs – 3 Nos

Zero Liquid Discharge plant and 10 TPD CBG plant

LB-TEX

Structural design of ETP / ZLD tankage

Revitalization of the Area North of Har Ki Pauri — storm water network

UIIDB / UPDCC, Uttarakhand

RCC storm drains, catch basins, manholes, road gullies and two outfalls to the Ganga Canal

Benchmark project

Sewerage network for Jyotirmath (Joshimath), Uttarakhand

We designed the sewerage network for Jyotirmath (Joshimath) — one of the most extreme hill regions in which a sewerage scheme can be laid. It is the project we hold up as our benchmark.

  • Extreme Himalayan hill terrain
  • Sewerage network design
  • UUSDA, Uttarakhand

Questions

Frequently asked

Which STP technologies have you designed?

SBR, MBBR, RMBR and constructed wetland, for plants of 1.0 to 5.5 MLD.

For ETP and ZLD plants, what is your scope?

The structural design of the ETP and ZLD tankage and associated structures. The treatment process for industrial effluent is normally supplied by the technology provider.

Let’s discuss your project