Intake Well & Pump House Design

Intake well, approach bridge and pump house design

River and reservoir intakes designed for the full range of drawdown and flood levels, with the well, the approach bridge and the pump floor covered in one design package.

An intake well has to work at the lowest drawdown level and survive the highest flood. We fix those levels, the scour depth and the pump submergence first, then size the well, design the steining, cutting edge and well curb for sinking, and design the approach bridge and the pump house superstructure around the mechanical layout.

Our intake work includes wells up to 10 MLD with approach bridges for MPIDC, MP Jal Nigam and municipal bodies in Madhya Pradesh and Maharashtra.

What the package covers

  • Intake well and jack well sizing
  • Steining, cutting edge and well curb design
  • Sinking stability and skin friction checks
  • Approach bridge: deck, piers and foundations
  • Pump floor, operating floor and hoisting arrangement
  • Pump house and sump-cum-pump house superstructure
  • Machine and equipment foundations
  • Break pressure tanks on the raw water main

How the design is done

What goes into the design

Hydraulic basis

Lowest drawdown and highest flood levels, scour depth, pump submergence and port levels fixed in writing before design begins.

Structural design

Well and bridge design under earth, water, flood and seismic loads, with flotation and stability checks in every load case.

Mechanical coordination

Mechanical GAD converted to a civil GAD, with pump bases, openings and crane loads taken from the equipment supplier data.

Deliverables

What you receive

  • Design basis report with levels and load cases
  • Civil GAD of the well, bridge and pump house
  • Structural calculations and sinking checks
  • RC detailing drawings and bar bending schedules

Codes and standards

  • IS 456Plain and reinforced concrete
  • IS 3370 (2021)Liquid retaining structures
  • IS 800General construction in steel
  • IS 1893 / IS 13920Seismic design and ductile detailing
  • SP 34 / IS 2502Detailing and bar bending
  • IS 875Loads on buildings and structures
  • CPHEEOWater Supply & Sewerage Manuals
  • IS 1904 / IS 2911Foundations and piles

Relevant experience

Projects from our reference list

Project / workClient / contractorOur scope

Augmentation of Water Supply, Sendhwa, Dist. Barwani (AMRUT 2.0)

Nagar Palika Parishad Sendhwa

Intake well, approach bridge and break pressure tank

Gairatganj–Silwani Multi-Village Scheme, Dist. Raisen

Madhya Pradesh Jal Nigam Maryadit, Bhopal

Intake well structural design and drawings

10 MLD Intake Well, Bhamragarh

MPIDC

10 MLD Water Supply Scheme, Bhurkalkhapa Industrial Area, Dist. Seoni (project value Rs. 80 Cr)

MPIDC, Regional Office Jabalpur

DPR covering intake, WTP, 500 / 1000 / 2000 KL structures and sump

Questions

Frequently asked

Do you design the approach bridge as well as the well?

Yes. The well, the approach bridge and the pump house are designed as one package so that levels and loads are consistent.

Can you work from a mechanical GAD supplied by the pump vendor?

Yes. Converting a mechanical GAD into a civil GAD is a standard first step in our process.

Let’s discuss your project

Send us the drawings, the tender scope or simply the brief, and we will revert with a scope note, a delivery schedule and a fee proposal.